Text being imported is too large. Paste command ignored.
Hide Document
Document
To Graph
Become Graph
= Graph of...
Required Inputs
Equation text is too large.
Document text is too large.
Variable Min Max
No variables are selected.
Set scale?
Undefined minimum.
Incorrect numeric format.
Undefined maximum.
This entity is defined to be a constant. Constants cannot become graphs.
The scaled max must be greater than the scaled min.
X-Scale must be within 10 -> 1000 %
Y-Scale must be within 10 -> 1000 %
X-Border must be within -90 -> 1000 %
Y-Border must be within -90 -> 1000 %
Sorry, but there isn't enough memory to import this picture.
Couldn't find a PICT in the Clipboard
Weeks
Months
Quarters
Years
There must be at least two data points.
The maximum number of data points is 1500.
Undefined minimum bound.
The graph extremes may not be equal.
Undefined maximum bound.
Imported data in incorrect format. Paste command ignored/subscriber cannot be updated.
Maximum number of data points is 1500. Paste command ignored/subscriber cannot be updated.
Minimum y has to be less than maximum y.
Minimum x has to be less than maximum x.
Output data must be selected in order to enter this field.
In discontinuous mode, the last point cannot be edited.
Circular connection!
Couldn't add to connector list
At least one cell in the Output List must be selected for paste to execute.
INITIAL(
Fill
Delay
Not all inputs to Conveyor are defined.
Incorrect numeric format in Transit time.
Transit time must be greater than or equal to DT, which currently is
Not all inputs to Oven are defined.
Incorrect numeric format in Fill time.
Fill time must be greater than or equal to DT, which currently is
Incorrect numeric format in Inflow limit.
Inflow limit must be greater than zero.
Incorrect numeric format in Capacity.
Capacity must be greater than zero.
Some conveyor transit times and oven cook times (or fill times) have become invalid as a result of DT changing. These values will be changed to valid values for the new DT.
Cook time must be greater than or equal to DT, which currently is
Undefined DT.
DT must be a positive number.
DT must be an integer when it is larger than one.
From time cannot be greater than To time.
DT cannot be smaller than 1e-6.
DT has to be evenly divisible into one.
Undefined Report Interval
quitting
If you change From, To, or DT, all unlocked comparative graphs and tables will be cleared.
The report interval currently is set to Every DT.
From time must have a value.
To time must have a value.
Document*
Report interval cannot be less than DT.
The Inflow Multiplier must be greater than or equal to zero.
Pause interval must be greater than or equal to DT.
The Leakage fraction must be greater than or equal to zero.
The Leakage fraction must be less than or equal to one.
Undefined Pause Interval
The Length of the no-leak zone must be greater than or equal to zero.
The Length of the no-leak zone must be less than or equal to the transit time.
Unit conversion data will be deleted.
Cook time
Oven outflow = Contents of oven after Cook time, zero otherwise
Oven outflow:
Leakage flow:
Leakage fraction
Equations redefined while paused must evaluate to constants.
Cannot define non-constants and stocks in Pause mode.
This flow cannot be unit-converted because it is not conserved. Please remove connector.
Please select sector(s) to run, or "Run Entire Model".
Pause Interval must be evenly divisible by DT.
Length of simulation must be greater than or equal to DT.
Clipboard does not contain data of the correct format. Paste command aborted.
This entity is defined to be a constant. Constants cannot be graphs, so your graph will be deleted.
Sorry, there isn't enough memory to create this dialog.
closing
Cannot define entities during a Sensitivity Run.
Run Selected Sectors can only be chosen if there is at least one sector that has all of its enclosed entities defined.
There is not enough memory to change the number of data points. Try quitting and increasing the free RAM before re-opening the application.
= roll-down of ...
= roll-up of ...
Roll-down inflows cannot take connectors. Please remove them.
Please enter a number between 1 and 12000. A point size greater than 12000 will result in text that is larger than the diagram.
Please enter an integer between 1 and 12000.
Display From must have a value.
Display To must have a value.
Display From cannot be less than %g, the time of the first data point in this graph.
Display To cannot be greater than %g, the time of the last data point in this graph.
Display To must be greater than Display From by at least one DT.
pt
From cannot be greater than %g, the time of the last data point in this graph.
Undefined current value.
Current value is out of range.
Reset value is out of range.
Undefined reset value.
Incorrect numeric format in Cook time.
DT cannot be larger than one million.
DT cannot be larger than the table's report interval. Do you want to change the table's report interval to reflect this DT?
At least one equation is undefined for this arrayed variable.
The capacity must be infinite, or there is an implicit circular connection.
Clipboard does not contain data of the correct format. Copy the data of right format to clipboard before selecting import data.
There are more data points to be imported than you have specified in # of Runs. Import anyway? Extra data points will be ignored.
There are fewer data points to be imported than you have specified in # of Runs. Import anyway? # of Runs will be reduced to reflect imported data.
The current model is in Cycle-time run mode which can only use Euler's integration method. All other modified settings will be applied.